Chandana Dalugoda Consultants

  • Completed and handed over to the client in August 2025.
  • Contractor- K & A Engineers (Pvt) LTD
  • Equipment- Central air conditioning system with a Hitachi water-cooled water chillers 200 x 4 Nos., 12 Nos AHUs, Humidity-controlled AC system

Leave a Reply